Hafnium

Search "hafnium" (found in nuclear plant control rods) within blog search gadget on right column

Sunday, November 11, 2007

Faces against the Dump today at 3 PM

Please gather today at 3PM at the Sunland Park Desert View Elementary
school.

People from the Sunland Park Grassroots environmental group, Colonias
Development Council, and others will gather for a photo against the
Regional Camino Real Landfill (DUMP), which is trying to renew a
ten-year permit.

This Dump is located on our water supply (the Rio Grande) just hundreds
of feet above the aquifer that feeds the Hueco Bolson at the Paso del
Norte; and right on an international border (despite the La Paz accord
(agreement) to not turn the border into a dump.)

The Dump is starting a methane-to-energy project. Only about 50% of the
gases coming off the dump are methane, we think -- the rest, only the
almighty apparently knows. Beneath the dirt at the dump lie toxic
waste recently disclosed by Phelps Dodge; and, loads of Zinc-stack
demolition debris from ASARCO (taken down during the Toxic-waste burning
years). The Dump accepts commercial waste from USA industries in Cd.
Juarez and El Paso and at least one person has seen a truck come here as
far away as Chicago...

Please come and stand with everyone.

Gas drilling's dirty side effect: Radioactive material....

Gas drilling’s dirty side effect: Radioactive material brought up from Barnett Shale during production
10:01 AM CST on Sunday, November 11, 2007 By Peggy Heinkel-Wolfe / Staff Writer
EDITOR’S NOTE: This is the first in a series of four stories on radioactive material generated by natural gas production in the Barnett Shale.
http://www.dentonrc.com/sharedcontent/dws/drc/localnews/stories/DRC_NORM1_11-11.1fb48b711.html

"
In Denton, Tarrant and Wise counties, all kinds of equipment — from pipes and separators to frac and brine-hauling tanks — have been decontaminated in [just] the past two years.

Texas Railroad Commission rules allow the industry to self-monitor for NORM, and many operators are slow to decontaminate the radioactive residue because of its cost, industry insiders say. Furthermore, only two of nearly 200 operators registered with the commission in the Barnett Shale’s core counties — Key Energy Services and Devon Energy — have provided for such decontamination in the past two years."

"Statewide, 140 such sites were decontaminated from January 2005 to the present, according to documents obtained from the Department of State Health Services, which oversees decontamination of the state’s hottest radioactive waste."