Hafnium

Search "hafnium" (found in nuclear plant control rods) within blog search gadget on right column

Thursday, November 3, 2011

El Paso ASARCO Clean-up Trustee admits that the ASARCO stacks contain contaminants

The El Paso ASARCO Clean-up Trustee admits that the ASARCO stacks contain contaminants that would require sealing the stacks to make these safe, rather than just letting the stacks stand.

"But Puga said money from his $52 million budget could be spent only on remediation efforts. It is possible, however, that something like sealing the stacks to prevent the spread of contaminants would qualify, he added."
The Trustee/TRUST did not test the CONTOP/Acid Plant's primary metal stack for contaminants, but wrote it off to the Bankruptcy court's decision releasing the TRUST from fiduciary-responsibility to test-for and/or remediate for the illegal chemicals illicitly incinerated by Asarco in El Paso TX from 1991-1998 -- in fact, the Bankruptcy courts totally publicly ignored that such incineration of D.O.E. and other wastes ever happened.

http://www.elpasotimes.com/news/ci_19242239

EPA to retest Illinois ASARCO zinc smelter site for Beryllium and other contaminants

After Asarco El Paso TX was secretly-caught by the EPA and Federal DOJ to be running a multi-state illegal and unpermitted hazardous waste disposal/incineration operation from 1991-1998, the EPA made ASARCO do a demolition and clean-up of all buildings/stacks related to its El Paso Asarco zinc plant.  We are not told how much Beryllium is on site; but, we note that recently the EPA is re-testing an Illinois Asarco Zinc plant site (active until 1994) that is contaminated with beryllium.  Beryllium is extremely toxic and there is a Federal Program to compensate all workers thus exposed to it on-the-job.

Why isn't the Federal DOJ/Bankruptcy Court/EPA requiring the TRUST doing El Paso Asarco's "clean-up" to look for and report the levels to the public of Beryllium?
Interested Taylor Springs [IL] residents learned during a meeting Oct. 20 with the US Environmental Protection Agency (EPA) that a thorough study of the Asarco Superfund site is set to begin.... Within the month, residents can expect to see technicians in required protective clothing [sampling] sediment and surface water from Shoal Creek Middle Fork, ground water from 14 existing monitoring wells and six additional yet-to-be-installed wells, air quality samples, and samples of fish, plants, and animals that may have been affected by site contaminants....Asarco is the 533-acre site of which about 100 acres is covered with residue from former zinc smelting and zinc oxide operations [up to 1994]. The residue includes zinc slag, plant cinder wastes, calcine clinker, sinter clinker, and coal. The primary contaminants are arsenic, beryllium, cadmium, copper, lead, nickel, and zinc.
http://www.thejournal-news.net/articles/2011/10/27/news/news03.txt