"The use of a portable smelter to process uranium-contaminated scrap metals was studied.^Objectives were to convert scrap metal located at many diverse sites into a form which would be suitable for unlicensed sale and reduce the problems associated with storing the scrap.^The Foundry Design Company study indicated the portable smelter concept was feasible from an equipment and transportation standpoint.^Capital costs for a 5-ton/hour (steel) nominal capacity unit were estimated to be $2,349,000.^Technical evaluation indicates that all the common metals considered, i.e., iron, nickel, copper, and aluminum, are amenable to uranium decontamination by smelting except aluminum.^An economic evaluation of the processing of the 30,000 tons of steel scrap to be generated by the Cascade Improvement Program by a portable smelter was made based upon information supplied by Foundry Design Company, plus the assumption that the product metal could be sold for $120.00 per ton.^This evaluation indicated a net return of $2,424,000 to the government could be realized.^The Health and Safety study indicated no major problems of this nature would be encountered in operating a portable smelter.^The legal review indicated the proposed operation fell within the authority of existing regulations.^Consideration of possible conflicts with regard to competition with the private sector was suggested.^(DLC)"
http://www.osti.gov/energycitations/product.biblio.jsp?osti_id=7269860
Blog shown in web view. Mrs. Mcmurray 's obtained proof Asarco smelter poisoned El Paso TX through what the EPA & US DOJ said was illegal burning of illegal hazardous/radioactive wastes 1991-98. (see 73 page 1998 conf. for settlement purposes only DOJ EPA Asarco doc,10/06 nytimes) We have never been told what actinides, forever chemicals, dioxins etc are present from illegal Asarco actions.
Hafnium
Search "hafnium" (found in nuclear plant control rods) within blog search gadget on right column
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment